We plan to upgrade SAP ECC 6 from SAP R/3 4.7, I have one doubt in this, can we upgrade SAP R/3 4.7 PRD system to SAP ECC 6 DEV system.

If it is possible, kindly give the procedures involved in it.

?

If you want to upgrade your Development envir?nment after refreshing it from production environment.

It is possible. The first step, do the system refresh of your development enviroment from production by system copy method. Please download system copy guide from below link according to your release:

https://websmp101.sap-ag.de/~form/sapnet?_SHORTKEY=01100035870000670917&

Then follow the upgrade procedure from SAP 4.7 to ECC 6.0. please find below the link for upgrade:

https://websmp101.sap-ag.de/~form/sapnet?_SHORTKEY=01100035870000670917&

First thing I want to make aware about is you will not be able to change database schema. After copy database schema of DEV environment will also be of production.

Then Steps are:

1) you have to export Java if it is double stack system.
2) database export and other things that you have to follow from SAP guide

also, if you want that after system copy same configuration your DEV system have (configuration means RFC’s, logical systems etc..) then before system copy you have to take backup of these configurations.

after that you have to import Java, restore database and perform other steps..

For details I will suggest you to follow SAP System copy guide.

?

The solution by Sunny